Renovations are complete at The Costume Store

Posted 1 month ago

2025/26 shared-space upgrades & room improvements are done!

We wanted your experience to be the best it could be whilst studying at UAL, so we're pleased to share that we worked with IQ to refresh and improve all of the bedrooms and some of the communal spaces at The Costume Store during the 2025/26 academic year.

These works were part of the general up-keep of the hall, with the renovation running from November 2025 through to May 2026.

Check out photos of the renovated spaces 👇

a modern kitchen with stainless steel appliances

A kitchen after the upgrades at The Costume Store

a room with a wood floor

A standard bedroom after the upgrades at The Costume Store

a room filled with furniture and a stove

A studio after the upgrades at The Costume Store

Watch our hall tour 

Find out more about The Costume Store.

Find out more about all halls of residence at UAL